Question 1: In a control process, which type of chart is dependent on both the type of data (continuous or discrete) and sample size?

Question 2: What type of data is required for an R-chart to monitor process variation when sample sizes are smaller than 12?

Question 3: The average of several sample means used to establish the centerline of a control chart is called the ____________.

Question 4: In a Lean Six Sigma project, a company's production process produces significant delays due to excessive motion and inventory buildup. This can be categorized as ____________.

Question 5: In a P-Chart, the standard deviation (error) for a proportion is calculated using which of the following equations?

Question 6: The Lean Six Sigma philosophy focuses on ____________.

Question 7: What is the purpose of the 5S methodology in Lean Six Sigma?

Question 8: In an X-bar chart, the UCL and LCL are calculated using the ____________.

Question 9: The Voice of the Process (VOP) represents ____________.

Question 10: In a Six Sigma project, which tool would be most useful for identifying the root cause of a process issue?

Question 11: Which Six Sigma tool is designed to visually represent the high-level steps of a process?

Question 12: In Lean Six Sigma, what does the "S" in SIPOC stand for?

Question 13: When analyzing two independent samples to determine whether their means differ significantly, which statistical test should be used?

Question 14: The Kaizen approach emphasizes ____________.

Question 15: A sample mean outside the UCL or LCL, while the process mean has not shifted, represents a ____________.

Question 16: The term "Critical to Quality" (CTQ) refers to ____________.

Question 17: A Lean Six Sigma team uses a Pareto Chart to ____________.

Question 18: What is the purpose of Failure Mode and Effects Analysis (FMEA)?

Question 19: Which of the following Lean Six Sigma concepts focuses on producing only what is needed when it is needed?

Question 20: In Six Sigma, "Z-value" is used to ____________.